University of Exeter Northcote House Plant Room
To strip out the existing plant room of which had come to the end of its functional life and replace with new energy efficient plant and controls.
Time scales to carry out the works were tight and our engineers worked around the clock to achieve the successful completion to ensure the heating was ready for the colder months. We worked off-site to pre-fabricate as much of the installation as we could to reduce time on site.
We also had to keep areas of the building heated during exam times.
The Project
Project Name: Northcote House Plant Room
Location: Exeter
Sector: Commercial
End Purpose: New Plant Facilities to serve Northcote House
The People
Client: University of Exeter
Main Contractor: INTOHEAT Ltd
Consulting Engineer: Services Design Solutions
The Contract
Contract Value: N/A
Contract Type: JCT Design and Build
Contract Length: 8 Weeks
Contract Completion: September 2016
Total Project Value:
How INTOHEAT Helped.
- BMS controls
- High efficiency boilers
- Gas services
- Cold water storage
- Water monitoring
- Heat exchangers
- Buffer vessels
- LTHW services
- LED lighting and automatic controls
- Mains distribution
- High-efficiency boilers
- Energy metering