Clifton Suspension Bridge Visitor Centre
The mechanical and engineering installation at a new build visitors centre for the iconic Clifton Suspension Bridge.
The Project
Project Name: Clifton Suspension Bridge Visitor Centre
Location: Clifton, Bristol
Sector: Commercial
End Purpose: Information Centre
The People
Client: Clifton Suspension Bridge Trust
Architect: AlecFrench Architects
Main Contractor: Rydon Construction Ltd
Consulting Engineer: Method Consulting LLP
The Contract
Contract Value: £1.32m
Contract Type: JCT Design and Build
Contract Length: 38 Weeks
Contract Completion: September 2014
Total Project Value:
£0
How INTOHEAT Helped.
- Above ground drainage
- Hot and cold water services
- Heating systems
- Air source LTHW
- Supply and extract ventilation systems
- Testing and commissioning
- Sanitary ware
Specifying a Similar Project?
Request a call back from our team today!