Full Store Decarbonisation Site – Barry

Retail Case Study

Project Overview.

Aligning with our client’s carbon neutral operational promises, INTOHEAT’s internal design team, devised a system that utilises the stores heat recovery from the CO2 refrigeration units and in turn complete removal of natural gas systems.

The Project

Project Name
Full Store Decarbonisation

Location
Barry

Sector
Retail

The People

Client
TESCO

Designer
INTOHEAT LTD

Main Contractor
INTOHEAT LTD

Project Description.

Appointed as Principal Contractor, INTOHEAT collaborated with the client’s respective engineering and store management teams during both the preliminary and construction phases, to ensure health & safety and store comfort were at the forefront of our thoughts.

Works comprised of the supply and installation of a new main sales air handling unit, fed from both new external R513a heat pumps, sourcing free heat from the sites existing refrigeration packs. Following review of the stores water consumption and energy expenditure, the existing gas fired water heater was replaced with point of use electric units. Replacement ventilations systems were installed within the stores partner areas by means of heat recovery, complete with building management system upgrades. The removal of redundant plant was programmed with the store’s key stakeholders, consisting of the safe lifting, removal and transportation of 23no items of plant from site.

INTOHEAT take pride in not only reducing the client’s carbon output, but also the stores maintenance requirements.

Seasonal changes were reviewed prior to starting the works, enabling us to plan works prudently and eliminate trade effecting temperatures resulting in a positive outcome for store partners and stakeholders alike.

The project had considerable external considerations; the project was delivered as a condensed programme, approaching the winter season. The store was live and operating, requiring consideration for noise and neighbourhood impact

How we helped.

  • Heating Systems
  • Ventilation & Ducting
  • Air-Conditioning Systems
  • Hot & Cold-Water Services
  • Gas Installations and Purging
  • Gas Meter Removal Management
  • BMS Control Systems
  • Electrical Services
  • Commissioning, Testing & Chlorination
  • Transportation, Craneage and Waste Management
  • Working Platforms and Plant Access Systems
  • Electrostatic Roof Testing
  • Remedial Roof Works and Decoration
  • Energy Performance Certification