The Depot Student Accommodation

Residential Case Study

This project involved an ‘off campus’ student accommodation development with mixed cluster of flats, studios, accessible rooms, penthouses and duplex units with 604 beds.

The Project

Project Name
The Depot Student Accommodation

Location
Exeter

Sector
Residential – Student Accommodation

End Purpose
604 Multi cluster Student bedrooms

The People

Client
MACE Developments

Architect
AHR

Main Contractor
Sir Robert McAlpine

Consulting Engineer
WSP

The Contract

Contract Value
£45m

Contract Type
JCT Design and Build

Contract Length
22 Months

Contract Completion
December 2019

Total project Value

£0

Project Descripition.

This project involved an ‘off campus’ student accommodation development with mixed cluster of flats, studios, accessible rooms, penthouses and duplex units with 604 beds. It comprised retail units at ground level and a mixture of modern amenities for students. Key to projects of this nature is the delivery date allowing sufficient time for the operator to complete their fitout and FF&E in time for student arrival in September.

The building is provided with a CHP unit and boilers to provide heating to radiators and domestic hot water calorifiers to serve bathroom pods. There is localised MEV to the bathrooms. The communal event space has MVHR along with VRF comfort cooling. Rainwater and foul drainage is also provided along with boosted cold water service. The whole of the mechanical plant is controlled by a Honeywell Hawk 800 BMS system.

The electrical installation comprised new power to a MCB with power factor correction. This is all connected to the CHP unit taking the lead and there is an additional standby generator to serve the firefight lifts and all the life safety systems. On top of the small power and lighting there were additional systems for disabled alarm call, CCTV, access control, ICT data and TV distribution system.