AHU Replacement – TESCO, Bromley By Bow

Retail Case Study

Design, installation and commission of three AHUs at a store in Bromley, part of wider energy efficiency aims.

INTOHEAT were invited to tender for the design, installation and commissioning of three salesfloor AHU’s at a store in Bromley. The units themselves had reached end of life, having served the store for 20+ years, and it deemed cost effective to replace the units rather than refurbish.

Working alongside one of our trusted partners, INTOHEAT designed the new plant complete with electronically communicated (EC) fans to increase efficiency and provide improved control. Works consisted of the management of ventilation systems, craneage and transportation, controls, electrics and roof upstands to suit the new plant.

The Project

Project Name
AHU Replacement – Bromley By Bow

Location
Bromley By Bow

Sector
Retail

End Purpose
Energy efficient AHUs

The People

Client
Tesco

Designer
INTOHEAT LTD

Principal Contractor
INTOHEAT LTD

How INTOHEAT helped.

  • System and plant design
  • Principal contractor
  • Refrigerant systems
  • Ventilation & ducting
  • BMS control systems
  • Electrical wiring
  • Commissioning
  • Air balancing
  • Craneage
  • BWIC
  • Lift, shift & transportation