Laver Data Centre, University of Exeter

Education Case Study

Providing state-of-the-art electrical installations for a new data centre at the University of Exeter.

INTOHEAT worked closely with the client to deliver a new strategic data centre to allow the university to create a resilient upgrade of their systems, this was built within the existing data centre where the control of electrical isolations, maintaining the building at the optimum temperature and ensuring a dust free environment were paramount to the successful delivery of the project.

The Project

Project Name
Laver Data Centre, University of Exeter

Location
Exeter

Sector
Education

End Purpose
Data Centre

The People

Client
University of Exeter

Main Contractor
Keysource Ltd.

The Contract

Contract Value
£1m

Contract Type
JCT Design and Build

Contract Length
6 Months

Contract Completion
2017

Total project Value

£0

How INTOHEAT helped.

  • UPS systems (inclusive of batteries and DC cabling)
  • Electrical switchgear palens
  • Generator
  • Chillers
  • RAHUs
  • AHUs
  • Earthing and bonding (including earth nests)
  • Busbar power modules
  • Power installation
  • Intelligent lighting controls
  • Emergency lighting self-test systems
  • Surge protections
  • Building management systems
  • Containment systems