Mechanical & Electrical Case Studies.

The sustainability team at INTOHEAT has worked on a wide variety of M&E projects to optimise building energy performance.

Filter Sectors

  • Heatherbridge School Refurbishment

    Refurbishment of an old care home to a new SEN school.

  • Plot J, Exeter – Hayleys Group

    Brand new purpose-built building in Exeter to facilitate the delivery of Hayley’s Group specialist equipment.

  • Whipton Hospital M&E Infrastructure Upgrades

    New mechanical plant and electrical distribution upgrades for NHS hospital.

  • Refurbishment of Sport Science Laboratories

    INTOHEAT conducted the full refurbishment of engineering and mechanical workshops at Exeter University.

  • MOD – Resuscitation Facility Refurbishment

    Refurbishment of a Military Medical Facility for the Military of Defence.

  • Photovoltaic Systems for Educational and Commercial premises

  • Ottery St Mary Hospital – M&E Infrastructure Upgrades.

    New mechanical plant and electrical distribution upgrades conducted for Ottery St May Hospital, Devon.

  • HV Substation Build & Refurbishment – National Grid

    Supporting national electricity networks across various sites throughout Devon and Cornwall, in partnership with National Grid.

  • Intelligent External Lighting Systems – Marldon Hall

    Creating safe access for students and staff at Marldon Hall, University of Exeter, with new intelligent external lighting systems.

  • Building Refurbishment & Extension – Launceston Medical Centre

    Aiding the health of the local community with the refurbishment and extension to Launceston Medical Centre.

  • Weston College Health and Living Centre

    INTOHEAT were key contractors in the build of the multi-million pound flagship facility at Weston College’s Loxton Campus, Weston-Super-Mare.

  • Harrison Building – Engineering and Mechanical Workshops

    Full refurbishment of engineering and mechanical workshops for the University of Exeter.

  • Functional Material Labs Refurbishment

    Refurbishment of existing premises to create purpose-built functional material labs.

  • Devonshire House – University of Exeter

    Full refurbishment of student study space and student guild offices.

  • Centre for Resilience in Environment, Water and Waste (CREWW) Building

    The creation of a new building for water research facility, Centre for Resilience in Environment, Water and Waste.

  • Chapelbridge School Refurbishment

    Refurbishment of an old care home to a new SEN school.

  • BMW Mini – Vertu Group

    Refurbishment of a car dealership for renowned BMW/Mini brand.

  • ADA Lovelace Building – Exeter Science Park

    New-build containing offices and laboratories for Exeter Science Park.

  • V Sim Engineering Building

    Construction of a new multi-use building on the Exeter Science Park site. New Engineering Building.

  • St James School

    A brand new Nursery and Primary school to facilitate the growth of the local area.

  • The Depot Student Accommodation

    This project involved an ‘off campus’ student accommodation development with mixed cluster of flats, studios, accessible rooms, penthouses and duplex units with 604 beds.

  • AB Dynamics

    AB Dynamics is a renowned supplier of integrated test systems for vehicles, serving the global automotive industry.

  • Gerber Foods

    This project involved the second phase of a multiphase development on this strategic development site for one of the largest food and drinks manufacturers.

  • Cheltenham Art Gallery & Museum

    A new modern gallery development of 1300m2 over four floors adjacent to the existing grade I listed building.

  • Bristol Old Vic

    This major refurbishment programme was the latest since the early 1970’s on the Grade I listed building and only required closure of the theatre for small parts of the construction period.

  • Rolls Royce DAFF

    Phase 2 Redevelopment at Filton, Bristol, comprised the design and construction of a new production and process facility and office accommodation to replace the former East Works.

  • Priory Road Lecture Theatre

    This project comprised the delivery of a new but traditional (didactic teaching) 450 seat lecture theatre as part of the Universities Priory Road development near the main precinct of the campus.

  • RNAS Yeovilton – ‘Dunker’ Building

    This is a state-of-the-art new training facility for the Royal Navy that creates realistic training environment for personnel to train in escaping and surviving from aircraft and amphibious vehicles operating over water.

  • Laver Data Centre, University of Exeter

    Providing state-of-the-art electrical installations for a new data centre at the University of Exeter.

  • CPK Somerset Larder

    Designed to supply canteens and restaurants across one of Europe’s largest construction projects.

  • Bowood House

    A 43 room country house, hotel and spa located within the listed landscape grounds of Lord Lansdowne’s Bowood House estate.

  • Boringdon Hotel Plymouth

    To create high end spa facilities to complement the existing Grade 1 listed hotel and the offerings to their clientele.

  • Knightstone Housing Association

    The mechanical and engineering works for an office block to serve as the new Headquarters for Knightstone Housing Association.

  • Clifton Suspension Bridge Visitor Centre

    The mechanical and engineering installation at a new build visitors centre for the iconic Clifton Suspension Bridge.

  • Wills Memorial Building

    he refurbishment of the Wills Memorial Building and Library at the University of Bristol.

  • Audley Inglewood Phase 2 & 3

    Mechanical works apartment fit out of blocks A, B and C. Internal fit out of 29 apartments and communal spaces.

  • Wellington Primary School

    Complete mechanical and engineering installation for a new-build, 14 class primary school on a greenfield site.

  • 58 Royal York Crescent

    Premium office space and two stunning three bedroom apartments.

  • University of Exeter South Cloisters

    Conversion of student accommodation into administrative offices.

  • University of Bath – Eastwood Residences.

    A range of works for the Eastwood Residences student accommodation at the University of Bath.

  • Southmead Hospital Sterile Services Department (SSD)

    The complete rebuild and complex relocation of Southmead Hospital’s SSD unit.

  • Somerset College of Art & Technology Phase 4

    To provide additional teaching space for laboratory and construction training use.

  • Richmond Building – Bristol University

    Complete a range of Mechanical and Electrical works at the Richmond Building at Bristol University.

  • University of Exeter Northcote House Plant Room

    To strip out the existing plant room of which had come to the end of its functional life and replace with new energy efficient plant and controls.

  • New Court Surgery

    Converting the old Western Power offices to a new Primary Medical Centre.

  • GPI Surgery Devonport Plymouth

    Construction of a brand-new community facility for health specialist developer GPIC Ltd

  • Royal Dart Hotel

    The project is the refurbishment and development of the grade II listed Royal Dart Hotel into five high quality apartments and a commercial space.

  • Chipping Norton Health Centre

    Bringing together Chipping Norton’s White House and West Street Surgeries in a new 3 storey building.

  • Milbrook Village

    Millbrook Village will be a retirement village of residential units split between a mix of apartments and cottages

  • The Railway Inn, Thatcher’s Cider

    To refurbish an existing barn and turn it into a restaurant serving traditional food and drink for the well known Thatcher’s brand.

  • The Cricket Fields – Student Accommodation

    Bedroom student accommodation to provide much needed additional accommodation to the City of Exeter.

Exceptional M&E solutions for renewable technologies.

When it comes to renewable technologies and energy efficient building services, INTOHEAT’s sustainability team is perfectly placed to deliver. Our case studies demonstrate a stellar track record of exceptional results, and our wide renown throughout commercial M&E. Discover some of the exciting projects and energy initiatives we’ve worked on over the years.

Enquire now.