TESCO Harlow Road – Air Curtain Replacement

Retail Case Study

Installation of new overdoor heaters at a store in Harlow facilitating a switch to electric.

The installation of new overdoor heaters were required at a store in Harlow, with a specific request to switch from LTHW to electric in line with our client’s energy commitments. INTOHEAT modified the existing bulkhead to suit the installation, with the units mounted above the entrance area. In addition to this, new power supplies and controls adaptations were also installed.

The Project

Project Name
Harlow Rd Door Curtain

Location
Front Entrance

Sector
Retail

End Purpose
Retail Store/Electric

The People

Client
Tesco

Designer
INTOHEAT LTD

Principal Contractor
INTOHEAT LTD

How INTOHEAT helped.

  • Mechanical & engineering
  • Ventilation
  • Air conditioning
  • Automatic controls
  • Hot & cold water
  • Above ground drainage
  • Sanitary ware